WRBorger Refinery: Gasoline Benzene Reduction, Heat Integration
Client Wood River-Borger (CoP & EnCana J.V.)

Location Borger, Texas
Project Gasoline Benzene Reduction
Duration 3Q 2008 - 1Q 2009
Scope Major heat integration revamp, reducing benzene to EPA limit
Role Systems Area Leader for three NGL distillation units
Tasks
  • Close out Actions from PHA and LOPA of assigned units
     
  • Markup P&IDs with PHA actions for IFD, then IFC release
     
  • Completeness/consistency check of Systems deliverables
    e.g. Hydraulics, Control Valves and Flow Elements, PSVs,
    Specialty Piping Items, Nozzle Connection Summary, Line Lists, Tie-in Lists, Paint & Insulation, equipment DP/DT
     
  • Weekly staff meeting with detailed agenda & action plan
     
  • Management of Change for P&IDs, Line List & Tie-in List
     
  • Facilitate interdisciplinary decisions on e.g. thermosiphon
    between Exchangers & Vessels, Control strategy between Process and CSE Engineers, cross-consistency checks