ADMA-Opco: Habshan Alpha Platform FEED
Client ADMA-OpCo

Location Abu Dhabi Umm Schaif field
Project

HAP platform FEED design

Duration Second half 2007 at Fluor
Scope HSE deliverables for sour, wet gas 4-level processing platform
Role Mainly HSE third-party contracts for HSEIA, QRA, HAZOP, SIL
Tasks
  • Took over HSE Lead, while still leading another project
     
  • Dealt with SOWs and Contracting strategy for services
     
  • Managed switch from one subcontractor to another and updated the scheduling to integrate all their efforts
     
  • Tracked against already submitted HSE Plan to ensure all project deliverables are completed, and squad checked
     
  • Worked with Project Management Consultants (KBR) to agree on strategy for fire protection, detection and SIL
     
  • Directed design for fire protection, fire & gas detection, temporary refuge, emergency egress and fireproofing
     
  • Ensured squad check of other disciplines' packages to pick up and resolve items requiring HSE input/decisions
     
  • Manage integration of HAZOP action items with list of outstanding design issues for P&ID "Issue for Design"
     
  • Developed design packages for fire protection equipment developed firewater P&ID, and piping material selection
     
  • Agreed on SIL strategy, and contracted for SIL workshop
     
  • Participated in 3-D model review of access, egress, F&G